RESTORATION PICTURES

First, the furniture was moved and the walls and ceilings were stripped.

 


phase1 000.jpg

phase1 001.jpg

phase1 002.jpg

phase1 003.jpg

phase1 004.jpg

phase1 005.jpg

 

 

Next, the back and front steps were removed
and the inside framing was done.

 

pics/construction/0507110847.jpg
Back Doorway
pics/construction/0507110851.jpg
Back Doorway
pics/construction/0507110852.jpg
Back
pics/construction/Backdoor.jpg
Back Door
ByeFrontSteps.jpg
Bye Front Steps
pics/construction/Front Wall.jpg
Front Wall
pics/construction/Kids_KitchenDoorways.jpg
Kids, Kitchen Doorways
pics/construction/Kitchen.jpg
Kitchen
pics/construction/Lavatory.jpg
Lavatory
pics/construction/Rob_in_Backhoe.jpg
Rob in Backhoe
pics/construction/Russ_Rob.jpg
Russ & Rob

 

 

Next, the back entry was completed and a front walkway was installed. Inside the new heating system was installed.

 

 

pics/construction2/0507110847.jpg
Back Door Foundation
pics/construction2/0507110851.jpg
Back Door Foundation
pics/construction2/0507110852.jpg
Back Door Foundation
pics/construction2/HVAC2.jpg
New Heating
pics/construction2/insidebackdoor.jpg
Inside Back Door
pics/construction2/insidebackdoor2.jpg
Inside Back Door
pics/construction2/BackDoor1.jpg
Back Door
pics/construction2/BackDoor2.jpg
Back Door
pics/construction2/Steps_Walkway1.jpg
Front Steps
pics/construction2/Steps_Walkway2.jpg
Front Steps

 

 

Now we have steps leading to the back entrance, and outside, new siding.

 

 

pics/construction3/0817111018.jpg
Back Stairs
pics/construction3/0817111019.jpg
Back Stairs
pics/construction3/0817111021.jpg
Outside, Back
pics/construction3/0817111022.jpg
Outside, Back
pics/construction3/0817111022a.jpg
Outside, Back